Washington, DC
St. Elizabeths West Campus, Headquarters Building
Scope/Solutions
The redevelopment of St. Elizabeths west campus includes a new 1.3 million sq ft headquarters building and associated support facilities. Working with the Clark Construction/WDG Architecture design-build team, SGH consulted on the building enclosure design and construction for the array of interconnected buildings clad with a combination of stone, brick masonry, and curtain wall and covered with vegetative roofing.
SGH worked closely with the architect and contractor to establish and execute the building enclosure design.
Highlights of our work include the following:
- Establishing continuity of below-grade waterproofing across interconnected building segments with irregular footprints on a sloped building site
- Coordination of both above- and below-grade expansion joints
- Establishing water/air/thermal barrier continuity at roofing and curtain wall transitions
- Critical review of the cable-supported curtain wall at the main entrance to the facility
Project Summary
Solutions
New Construction
Services
Building Enclosures
Markets
Commercial
Client(s)
WDG Architecture, PLLC | Clark Construction
Specialized Capabilities
Facades & Glazing | Roofing & Waterproofing
Key team members
Jeffrey Kerr
Managing Principal, Building Technology, Washington, DC
Additional Projects
Mid-Atlantic
Community of Hope Family Health and Birth Center, Washington, DC
With growing demands for medical and emotional wellness services, the Community of Hope sought to expand their Family Health and Birth Center and undertook a fundraising campaign to relocate and expand the facility. SGH served as the structural engineer of record for the project.
Mid-Atlantic
The Boro
The buildings house 750 apartments, 400,000 sq ft of office space, more than 200,000 sq ft of retail space, a new flagship grocery store, and a movie theater. SGH consulted on the building enclosure design for all four buildings and the podium.



