Woodside, NY
TLC Garage and Inspection Facility
Scope/Solutions
The City of New York’s Department of Design and Construction and Taxi and Limousine Commission (TLC) needed to expand and reconfigure their facility along the Brooklyn-Queens Expressway. By adding a new office building over the existing eight-lane garage, TLC gained space within the same footprint, while allowing them to modify ground-level garage operations to reduce wait times and congestion. SGH consulted on the curtain wall design.
SGH assisted the architect with the design of a custom unitized curtain wall system that balances constructability and cost constraints with energy and sustainability targets. Highlights of our work include the following:
- Reviewed the proposed design and recommended ways to improve performance
- Designed preliminary details and specifications to integrate the curtain wall with other enclosure systems, including a custom exterior shading system
- Evaluated thermal performance of the custom curtain wall system
1 of 4
Project Summary
Solutions
New Construction
Services
Building Enclosures
Markets
Infrastructure & Transportation
Client(s)
Ten Arquitectos
Specialized Capabilities
Building Science
Key team members
Additional Projects
Northeast
Shore Line Bridge Replacement
SGH assisted the contractor, Barletta Heavy Division (Barletta), by providing construction engineering services to facilitate removing and replacing the bridge with a new steel through-girder bridge.
Northeast
Logan International Airport, I-90/Route 1A Interchange
SGH assisted several contractors that looked for assistance with understanding the complex system of reinforcement, post-tensioning ducts and anchorages, and conduits, as well as with concrete quality at a drilled shaft.



