Queens, NY
John F. Kennedy International Airport, Terminal 1
Scope/Solutions
As part of a larger effort to create a contemporary global gateway, the new Terminal 1 at John F. Kennedy International Airport increases capacity with twenty-three new gates, incorporates sustainability initiatives, and elevates the travelers’ experience with modern amenities. SGH consulted on the fire life safety design for the first phase of the project, including fifteen gates and covering approximately 1.8 million sq ft over three levels.
SGH consulted on the fire life safety design, developing strategies for the terminal and concourse, as well as the AirTrain that runs through the facility. Highlights of our work include:
- Reviewing egress/life safety drawings and design drawings for code compliance
- Performing computational fluid dynamics modeling and providing the smoke control rational analysis for the large atrium that connects all the levels in the headhouse and features high ceilings with a central spine of clearstory windows
- Performing egress calculations and the smoke control analysis, including computational fluid dynamics modeling of smoke movement, for the fire-rated tunnel enclosure constructed around the existing AirTrain tracks that remained
- Coordinating with mechanical engineers on the smoke control systems
- Developing solutions for complicated building and fire code issues, such as exit capacity, exit access travel distance, and fire-resistance-rated separations
- Documenting the terminal and AirTrain life safety strategies in a report, which addressed requirements of the NYC Building and Fire Code, Port Authority of New York and New Jersey (PANYNJ) Tenant Construction Review Manual, and NFPA 130 and 502
- Helping the architect navigate challenging approval requirements with PANYNJ
Project Summary
Services
Performance & Code Consulting
Markets
Infrastructure & Transportation
Client(s)
Gensler
Specialized Capabilities
Fire Life Safety & Accessibility
Key team members
David Jacoby
Managing Principal, Engineering Mechanics and Infrastructure, Fire Engineering
Additional Projects
Northeast
99 Summer Street Parking Garage
The parking garage, constructed with concrete slabs on metal deck supported by steel beams and columns, includes two below-grade levels under a twenty-story office building. SGH performed a condition assessment and designed repairs to extend the useful life of the parking structure.
Northeast
Stop & Shop
Shop & Stop Store #539 is constructed with a rooftop parking deck over the supermarket. SGH was the engineer of record for a new split-slab waterproofing system design, and also evaluated and developed repairs to address concealed damage to the building structure and parking deck.